Indonesia 1 Twin Towers Project

Visits : Release time :2017-12-28

With a building area of 306,000 square meters, a building height of 303 meters, 7 underground floors, 59 floors above the ground, an excavation depth of 26.77 meters, and a local excavation depth of 32.2 meters, this Project belongs to a super high-rise and ultra-deep foundation pit project. The important and difficult points in the project management are: plane planning management, schedule management, deepening design management, integration of Chinese and Indonesian technologies, and integration of local resources.

This Project actively studies local practices in Indonesia, and at the same time introduces domestic advanced technologies and sums up the characteristic construction technologies applicable to Indonesia.

Reverse process jump-layer excavation technology: to increase the depth of a single excavation, excavate a two-floor structure construction space at a time, and make the construction of one layer of the structure not occupy the key route, the B2 and B3 layers of this Project adopt the jump-layer excavation technology to remove the pouring of the B2 floor from the key route, and the construction period is effectively shortened by about 52 days.

 

Reverse process jump-layer excavation technology

Soil formwork method construction technology: The excavated soil is used as a natural formwork. After the cushion is poured and the isolation layer is laid, the reinforcing steel is tied and the concrete of the structural floor is poured. Through the application of the soil formwork method, the investment in the floor slab formwork is saved, and the construction period is shortened by about 10 days compared to the conventional formwork construction.

 

Soil formwork method construction technology

Green quick removal system application: Green early removal formwork consists of the steel frame wood formwork panel and the upright tube with the early removal member, which is easy to operate and easy to turn over. Due to the simple operation of the formwork system, the efficiency of the formwork construction is effectively improved, and because it is an early removal system, the one-time input of the formwork is reduced.

 

Green quick removal system application

Chute method construction technology: the bracket and a set of articulated chutes are used to form an articulated chute system to accelerate the concrete pouring speed.

 

Articulated chute method construction technology

BIM technology: The BIM technology is used to conduct the plane layout and simulate the vehicle passing to avoid impeding on-site traffic due to the improper location of material yards. When the on-site operating conditions change, the BIM model is updated in time to ensure that the plane layout is reasonable and feasible. In addition, the BIM technology is used for collision detection, BIM model and animation clarification, project volume calculations and other functions to ensure the operation of the project.

 

BIM technology application


Project aerial view

双性道具play震动按摩器h| 总裁调教精跪趴灌尿喝尿play| 别揉我胸啊嗯~视频软件| 抖s调教抖m百合sm| 欧美成人三区| 国产综合99| 小雪的13又嫩又紧又多水书| 嫩模李丽莎喷水福利视频| 国产又黄又硬又粗| 黑人狂躁日本少妇在线小说| 年轻的老师做爰| 双腿吊起揉捏花蒂| 好爽好大好舒服| a一级黄色毛片| 一二三四在线观看免费视频中文版| 国产一区二区三区18| 贱骚扇b调教b小雪老师| 色黄大色黄女片免费中国| 女人被躁到高潮c嗷嗷叫免费视频| 欧美巨乳女优| 久久久国产一级| 美女被c了| 最好看的中文视频最好的中文| 日.本人xxxxxxxxx19| 国产在线国偷精品免费看| 日本美女裸| 娇妻被朋友粗大猛烈进出高潮电影| 欧美性xxxxx极品| 俄罗斯女人下面又进又爽| 亚洲女厕偷拍| juy616一色桃子在线播放| 国产精品对白一区二区三区| 欧美性欧美zzzzzzzzz| 99久久99久久精品免费看蜜桃| 久久婷婷国产麻豆91天堂徐州| 老牛嫩草二区三区观影体验| 你懂的小视频| 春色直播app525tv| 梦里寻他千百度| 少妇大叫受不了了爽爽爽摸摸视频| 国产日韩一级|