Located in Lize Financial Business District in Fengtai District of Beijing, Lize SOHO Project is designed by the world-famous master Zaha Hadid. It has 4 floors underground and 45 floors above the ground, with a building area of 172.8 thousand square meters and a total height of 200 meters. The metro lines 14 and 16 converge underground here. The design inspiration comes from DNA double helix. The streamlined anti-symmetric surface resembles dragon hovering; the fish scale curtain wall structure is complex; the difficulty of construction is great; the heteromorphic atrium variable curvature is rising. It is the highest in the world.

I. Super high-rise heteromorphic hydraulic creeping formwork construction technology

Lize SOHO Project adopts the super high-rise heteromorphic hydraulic creeping formwork construction technology for construction of core tubes above the ground. This Project has 46 floors of core tubes above the ground; the plane is composed of two symmetrical irregular circular arc walls; the overground structure has a large floor height change with the minimum height of 4.1m and the maximum height of 9.5m, thus the construction difficulty is great. The tower building structure is divided into interpolating steel rib, core tube wall, outer frame steel structure and horizontal steel. The vertical structure of the core tube is constructed first and then the horizontal structure is constructed. The pattern change of the project structure, wall retrieve of the main building and the formwork matching for the core tube wall are complicated.

II. BIM application technology

In terms of BIM application, BIM applications and innovations are selectively applied in combination with the actual needs of the Project. BIM is mainly applied to key technologies of super high-rise buildings, such as steel structures, electromechanical installations, prefabricated component processing, creeping formwork construction control, swing arm and tower crane cooperation, safety protection, intercrossing and matching of various specialties in the construction process of super high-rise buildings, simulation of vertical transportation, and comprehensive management of various departments, etc.

Underground construction of the Project takes the mechanical and electrical reserve and embedding, metro line connection and other parts needing to be deepened into account. The BIM model is used to conduct the setting-out and deepening of the complicated nodes for guiding the on-site construction. During the mechanical and electrical deepening of the Project, BIM software is used to inspect the comprehensive arrangement and collision of the pipelines, to make a collision report and to issue the drawings for approval of the owner and design department.

III. Metro line connection and deep foundation pit construction technology

This Project is constructed in advance, thus the operation time of metro lines 14 and 16 cannot be determined. The temporary blockage needs to be provided at the both ends of the completed metro lines so as to protect the metro line.

There are two innovation points, i.e. waterproof node treatment and temporary blockage and protection.

Project effect diagram


Project atrium


Real scene of the Project upon completion


BIM technology application to the Project


Atrium BIM model

国产成人av大片| 国产色婷婷亚洲999精品网站| 清纯校花的沦陷免费阅读小说| 国产女人被狂躁到高潮视频9| 办公室和老师.啊,慢点| 生活一级毛片| 少妇激情一区二区三区久久大香香| 谷原希美经典av在线| 国产色综合一区| 女人毛片a级大学毛片免费| 国产一区二区电影| 521a人成v香蕉网站| 国产肉体xxxx裸体xxxx一| 亚洲日本精品一区二区三区| 娇妻粉嫩被两个黑人前后夹击小说| 想看黄色一级片| 自拍偷拍 亚洲| 少妇又色又紧| 国内自拍视频网| 花季传媒每天三次免费| 鲤鱼乡啊太粗太快了bl| 吻胸揉屁股摸腿娇喘视频网站| 青娱国产盛宴极品免费| 艳妇蹋荡乳欲伦岳在线| 国产精品久久麻豆| 美闺性猛交ⅹxxx富婆| 中国裸体视频| 啊灬用力灬啊灬啊灬啊灬小丹| 日韩免费视频一区二区| 成年女人免费观看视频| 婚后调教跪撅打屁股h姜罚| 亚洲精品美女久久久久久久久久| av免费线上看| 豪乳老师刘艳第八部| 男人av在线播放| 第三影视 写真片福利| 黄色特级一级片| 小莹的幸福生活小说免费阅读| 把熟睡的少妇弄到高潮| 啊灬用力灬啊灬啊灬啊灬湿老女人| 在线观看一级|